Authors : Mrs. RupaliA.Dasarwar,Mr. ShibuK.K.Thomas ,Ms.SwatiN.Chalkhure, Ms. Nikita D.Tichkule ,Ms. Vaishnavi G. Dhole
Abstract – Every electrical system needs power as the supply. Power is rated at each and amount of energy is used to accomplish the work. Electrical power is measured in kwhr which is determine by V*I. In the industries high power consumption than the contracted one can lead to severe penalties. Often there are power peak produce by the load co incidence that normally do not work in simultaneously. In order to avoid penalties one solution would be increase in the contracted power according to the maximum resister peak but on contract this will force to pay higher power than it is really needed. Another solution will be avoiding the consumption peaks through a vigilance element that a device of the risk situation or it can disconnect certain noncritical load such as air conditioning compressors lighting and fans. Maximum demand refers to the maximum amount of electrical energy that is being consumed at a given time.
The general purpose of maximum demand meter is to monitor and control the maximum power demand in order also can reduced the monthly electricity bill. By using the meter, the user do not have to worry that their electricity bill will increase thus have to pay lot of money on bills. Maximum power demand meter can benefit every user specially factories. The information and also knowledge that been used to produce the meter can benefit the society. Assembly language will be used to design a program for specific purpose which is to monitor and controlling power demand.
Innovative Scientific Publication,
Nagpur, 440036, India
Email:
ijiesjournal@gmail.com
journalijies@gmail.com
© Copyright 2025 IJIES
Developed By WOW Net Technology